$250 psf per Plot Ratio: What the Sengkang West Bid Table Tells Buyers

When a new industrial project comes to market, the most useful number available long before pricing is released is what the developer paid for the land. For Sengkang West, that number is public. The headline figures. Soilbuild’s winning bid of $156,114,008 works out to approximately $2,692 per square metre per plot ratio — roughly $250 […]
Fenceless, 40% Green, and 70 Public Truck Lots: Inside JTC’s Brief for Sengkang West

Tender conditions are not marketing material, which is exactly why they are worth reading. JTC’s Technical Conditions of Tender for the Sengkang West parcel run to dozens of pages of binding requirements, and several of them will shape the day-to-day experience of anyone who ends up occupying space there. A heavy vehicle park open to […]
Reading the Map: Why Sengkang West Works for Industrial Occupiers

Most industrial sites solve one problem well. Sengkang West is unusual in that it addresses two at once: how goods get out, and how people get in. Freight. The parcel is reached from the Tampines Expressway and the Seletar Expressway, feeding onto Sengkang West Road, Seletar West Road and Yio Chu Kang Road. The SLE-TPE […]
Soilbuild Lands Sengkang West Site with $156.1 Million Bid

JTC has awarded the industrial land parcel at Sengkang West to Soilbuild Group Holdings Ltd., which submitted the highest of four bids at $156,114,008 — approximately $2,692 per square metre per plot ratio, or around $250 per square foot of permissible gross floor area. The tender was launched on 24 June 2025 under JTC’s Industrial […]